Important instructions for laying floor tiles
1 Prepare base mortar with cement and sand in the ratio of 1:4
2 The total mortar thickness should not be more than 1 Inch.
3 Set the levels for the floor. ie.,, dead level or slop as specified by the Architect / Contractor.
4 Prepare cement slurry with cement and water to form a thick paste and spread it on the leveled base mortar.
5 Wet the rear side of the tile with water. (Complete immersion of tile is not necessary).
6 If tiles are square or rectangular in shape, set the right angles for the area and place the first tile along the right angle line on base mortar. Tap gently with the rubber.
7 After laying, immediately clean the surface of the tiles with clean wet sponge. Ensure that the base mortar cement which squeezes through joints does not settle on the tile.
8 Also make sure that the water used is not hard or brackish.
9 Do not use the area laid for 48 Hours.
10 Fill the joints with pointing materials ie., mixture of white cement and desired color pigment. For higher quality of finishes, you could use, if required, a polymer based cementitious tiling joint filler. Do not apply the pointing material all over the surface.
11 Allow the pointing material to set for 15 minutes and clean the surface of the tile with clean wet sponge, in order to remove the excess pigment on the tile surface.
12 Wash the surface with soap water or mild detergent to get a clean surface.
Important instructions for laying wall tiles
1 Plaster the surface to be tiled with mortar (Ratio of cement and water is 1:3)
2 Prepare cement slurry ie.,,mixture of cement and water to form a thick paste
3 Wet the rear side of the tile with sponge and then spread the cement slurry on it.
4 Instructions given above starting from 5 - 12 of floor tiles laying should be followed.
CONDITIONS
Desired conditions for laying of Coral Designer Tiles
The following have to be completed prior to commencing laying of Coral Tiles.
1 Final painting of ceiling in rooms
2 Two coats of wall painting in all rooms. (The final painting should be done only after laying of floor tiles)
3 Wiring and fixing of all electrical components to be completed.
4 Plumbing works to be completed
5 Fixing and polishing of windows and doors should be completed
6 Bathroom floor and wall tiles should be laid after all the work in the bathroom is completed.
7 Fixing of wall and platform slabs to be completed
8 If Mosaic / Marble or any other natural stone which needs machining or polishing is being done in any part of the floor, it is necessary that this work is completed before commencing the laying of Coral Tiles
If all the above precautions are taken and instructions followed, Coral Tiles will give you decades of trouble free service.
Top
Home   |   The Company   |   Tiles    |    Gallery   |    Instructions   |   Spartec    |    Contact Us
Copy rights reserved @ 2009 by Coral Designer Tiles Powerd by Antz media